Domain – ADCON INFRASTRUCTURE

  • Location: Melbourne VIC
  • Size: 350,000m2
  • Completion: Estimated 2024

Anzac Station will be located directly under St Kilda Road near the intersection of Albert Road and Domain Road.
It will be accessed from four entry points. One entrance will be located on the outer edge of the Shrine of Remembrance Reserve, another at the Albert Road Reserve and two further entrances at the new Domain train / tram interchange directly above the station on St Kilda Road, which will feature a fully accessible tram superstop.
Anzac Station has been designed as a ‘pavilion in the park’ – an integrated public building and landmark that connects seamlessly with surrounding parklands.